GRAVITY SEWERS
Central Duffin Trunk Sewer
Scope of work completed:
- 8no. shafts of 5.5m internal diameter and depths up to 15m installed in saturated sand and silt ground conditions.
- Installation of 1850m of 1200mm sanitary sewer and 260m of 1350mm by Microtunnel with drive lengths ranging from 160m to 440m.
- Installation of 420m of 1200mm sanitary sewer and 150m of 1350mm by opencut.
- Vortex drop structure installed in 5.5m internal diameter permanent shaft 15m deep.
- Location: Pickering, Ontario
- Owner: Durham Region
- Role: General Contractor
- Project timeline: April 2022-Present