PUMPING STATIONS
Cambridge Block 135 Sanitary Pumping Station
Scope of work completed:
- 1no. Pumping Station wet well of 9.5 diameter and depth of 17m installed in mixed ground conditions using the cast insitu sinking caisson method.
- Wet well used as a reception shaft for 1200mm Microtunnel drive.
- Wet well outer walls and sealing base installed in 3.5 weeks.
- Internal works and slab on grade completed in 10 weeks.
- Location: Cambridge, Ontario
- Owner: City of Cambridge
- Role: Specialist Subcontractor
- November 2021-December 2021, March 2022-June 2022