PUMPING STATIONS

Cambridge Block 135 Sanitary Pumping Station

Scope of work completed:

  • 1no. Pumping Station wet well of 9.5 diameter and depth of 17m installed in mixed ground conditions using the cast insitu sinking caisson method.
  •  Wet well used as a reception shaft for 1200mm Microtunnel drive.
  • Wet well outer walls and sealing base installed in 3.5 weeks.
  • Internal works and slab on grade completed in 10 weeks.