PUMPING STATIONS
King City Sanitary Pumping Station
Scope of work completed:
- 1no. Pumping Station wet well of 5.5m diameter and depth of 14m installed in saturated silty clay ground conditions using the cast insitu sinking caisson method.
- Wet well used as a receiving shaft for 1200mm Microtunnel drive.
- Dry well constructed using traditional open excavation and forming techniques.
- Location: King City, Ontario
- Owner: York Region
- Role: Specialist Subcontractor
- Project timeline: May 2021-July 2021